Egypt Ready for All Possible Scenarios in GERD Dispute

 An aerial view of the Nile River, agricultural lands and homes from an airplane window on a flight between Cairo and Luxor on Saturday, April 10, 2021 (EPA)
An aerial view of the Nile River, agricultural lands and homes from an airplane window on a flight between Cairo and Luxor on Saturday, April 10, 2021 (EPA)
TT

Egypt Ready for All Possible Scenarios in GERD Dispute

 An aerial view of the Nile River, agricultural lands and homes from an airplane window on a flight between Cairo and Luxor on Saturday, April 10, 2021 (EPA)
An aerial view of the Nile River, agricultural lands and homes from an airplane window on a flight between Cairo and Luxor on Saturday, April 10, 2021 (EPA)

The Egyptian Minister of Irrigation Mohamed Abdel Aty said his country was ready to deal with all possible issues arising from the Grand Ethiopian Renaissance Dam (GERD).

Abdel Aty's televised statements came after Addis Ababa announced its plans to move forward with filling the dam reservoir when the rainy season begins even if no binding legal agreement was reached in this regard.

However, the minister said that his country is not concerned, even if Ethiopia implements the second phase of filling the dam, saying the state would not wait for any damage to occur and that Egypt had prepared for all possible scenarios five years ago.

Egypt and Sudan on Saturday rejected an Ethiopian proposal to share data on the operations of its giant hydropower dam on the Blue Nile after negotiations between the three countries in Kinshasa this week ended without progress.

“Ethiopia invites Sudan and Egypt to nominate dam operators for data exchange before the filling of GERD in upcoming rainy seasons,” the Ethiopian foreign ministry wrote in a tweet on Saturday.

However, Cairo and Khartoum maintained that they are seeking a legally binding agreement over the operations of the dam, which Addis Ababa says is crucial to its economic development.

Cairo rejects “any unilateral measures taken by Ethiopia and will not accept reaching understandings that provide political and technical cover for the Ethiopian efforts to impose a fait accompli on the two downstream countries,” the Irrigation Ministry said.

Cairo fears the potential negative impact of GERD on the flow of its annual share of the Nile’s 55.5 billion cubic meters of water especially that it relies on it for more than 90 percent of its water supplies.

Abdel Aty said that while reserves at the Aswan High Dam could help stave off the effects of a second fill, his chief concern was drought management.

The Egyptian state will not allow any water crisis to occur, he stressed, noting that it is better for Addis Ababa to allow resolving this decade-long crisis through negotiations.



Sisi: Electricity Interconnection Projects with Saudi Arabia a Model for Regional Cooperation

Sisi met with Prime Minister Mostafa Madbouly, Minister of Electricity and Renewable Energy Mahmoud Esmat, and Minister of Petroleum and Mineral Resources Karim Badawy. (Egyptian Presidency)
Sisi met with Prime Minister Mostafa Madbouly, Minister of Electricity and Renewable Energy Mahmoud Esmat, and Minister of Petroleum and Mineral Resources Karim Badawy. (Egyptian Presidency)
TT

Sisi: Electricity Interconnection Projects with Saudi Arabia a Model for Regional Cooperation

Sisi met with Prime Minister Mostafa Madbouly, Minister of Electricity and Renewable Energy Mahmoud Esmat, and Minister of Petroleum and Mineral Resources Karim Badawy. (Egyptian Presidency)
Sisi met with Prime Minister Mostafa Madbouly, Minister of Electricity and Renewable Energy Mahmoud Esmat, and Minister of Petroleum and Mineral Resources Karim Badawy. (Egyptian Presidency)

Egyptian President Abdel Fattah al-Sisi affirmed that the electrical interconnection project with Saudi Arabia represents a model of regional energy cooperation and a benchmark for future similar ventures in electrical connectivity, directing close monitoring of all project details.
Sisi made these remarks during a meeting with Prime Minister Mostafa Madbouly, Minister of Electricity and Renewable Energy Mahmoud Esmat, and Minister of Petroleum and Mineral Resources Karim Badawy.
According to a statement by the Egyptian presidency on Sunday, the discussion reviewed the status of electrical interconnection projects between Egypt and Saudi Arabia, emphasizing their importance in enhancing grid efficiency and stability while optimizing the use of generation capacity during peak demand periods.
Cairo and Riyadh signed an agreement in 2012 to establish the electrical interconnection project at a cost of $1.8 billion, with Egypt contributing $600 million (1 USD = 49.65 EGP in local banks). In a government meeting in mid-October, Madbouly announced that the interconnection line is expected to become operational in May or June of next year, with an initial capacity of 1,500 megawatts.
This initiative is the first of its kind to enable high-voltage direct current (HVDC) power exchange in the Middle East and North Africa region. It connects Badr City in Egypt to Medina via Tabuk in Saudi Arabia. Late last month, Madbouly highlighted that the project, set to produce 3,000 megawatts in two phases, is a landmark achievement for Egypt’s energy sector.
Presidential spokesperson Mohamed al-Shenawy stated that the meeting also highlighted the progress on the Dabaa Nuclear Power Plant. The project is seen as vital to Egypt’s comprehensive development strategy, which aims to diversify energy sources through renewable and alternative means, improving service delivery to citizens.
Located in northern Egypt, the Dabaa plant will consist of four nuclear reactors with a combined capacity of 4,800 megawatts (1,200 megawatts per reactor). The first reactor is expected to be operational by 2028, with the others coming online sequentially. The Egyptian government has pledged to fulfill its commitments to ensure the project meets its scheduled timeline.
The president also directed the government to intensify efforts to attract investments in the energy sector, develop the management of the national gas grid, and ensure stable energy supplies for both electricity and industrial sectors. Furthermore, he urged rapid progress on renewable energy projects to diversify energy sources, expand grid capacity, and modernize the network using advanced technologies to enhance efficiency and reduce losses.