Khartoum Announces Deal on Filling Renaissance Dam in 7 Years

The Grand Renaissance Dam hydroelectric project in Ethiopia. (AFP)
The Grand Renaissance Dam hydroelectric project in Ethiopia. (AFP)
TT

Khartoum Announces Deal on Filling Renaissance Dam in 7 Years

The Grand Renaissance Dam hydroelectric project in Ethiopia. (AFP)
The Grand Renaissance Dam hydroelectric project in Ethiopia. (AFP)

Sudanese Irrigation Minister Yasser Abbas said on Sunday that Egypt, Ethiopia, and Sudan have agreed on filling the Grand Ethiopian Renaissance Dam’s (GERD) reservoir “over a period of up to seven years.”

The Sudanese official said the two-day talks held on November 15 in Addis Ababa between the three states and in the presence of representatives from the US and the World Bank, made progress on some disputed issues.

He said a breakthrough in the talks was reached over the hydroelectric dam, which has generated much tension between Egypt and Ethiopia over the past few years.

Ethiopia insists the $4 billion hydro-electric barrage is essential for its economic growth given that most of its population still lives without electricity.

Abbas said last week’s negotiations also tackled the “permanent operations of the dam and its effect on the dam systems in Egypt and Sudan.”

While the spokesperson of the Egyptian Ministry of Water Resources and Irrigation Mohammed al-Sibai refused to confirm or deny the Sudanese minister’s comments, he told Asharq Al-Awsat that the Addis Ababa talks discussed filling the dam’s reservoir in stages and based on the hydraulic system of the Blue Nile River.

He said that such technique would help prevent any harm to downstream countries.

Representatives from Egypt, Ethiopia and Sudan are set to meet on December 2-3 in Cairo to continue technical talks over outstanding matters.

On Saturday, Ethiopian Ambassador to Egypt Dina Mufti told Asharq Al-Awsat that any misunderstanding between Egypt and Ethiopia should be solved peacefully.

Egypt states that all Nile Valley countries have a right to economic development. However, Cairo insists that this policy should not affect “its interests and rights in the Nile,” particularly that Egypt relies on the river to cover more than 90 percent of its irrigation and drinking water needs.

Meanwhile, the president of the Arab Parliament Mishaal bin Fahm Al-Salami said Sunday he had sent a written message to the Ethiopian prime minister and the head of the Ethiopian House of Peoples’ Representatives announcing the Arab Parliament’s solidarity with Egypt and Sudan in protecting their water security.

In a post on his official Twitter account, Salami stressed the importance of reaching a fair agreement on filling and operating the GERD as soon as possible, and in a way that protects the interests of all parties.



Yemen’s Houthis Move Weapons to Saada to Avoid More US Attacks

A protester carries a mock rocket during a rally in solidarity with the Palestinian people, at Sanaa University, in Sanaa, Yemen, 15 January 2025. (EPA)
A protester carries a mock rocket during a rally in solidarity with the Palestinian people, at Sanaa University, in Sanaa, Yemen, 15 January 2025. (EPA)
TT

Yemen’s Houthis Move Weapons to Saada to Avoid More US Attacks

A protester carries a mock rocket during a rally in solidarity with the Palestinian people, at Sanaa University, in Sanaa, Yemen, 15 January 2025. (EPA)
A protester carries a mock rocket during a rally in solidarity with the Palestinian people, at Sanaa University, in Sanaa, Yemen, 15 January 2025. (EPA)

The Iran-backed Houthi militias have moved large amounts of their weapons to their main stronghold of Saada in northern Yemen to protect them against US strikes that have intensified on the Amran province in a bid to destroy the militias’ underground arms caches.

Informed Yemeni sources said the Houthis have moved rockets and drones from Amran to Saada in the north, fearing they may be targeted by US strikes.

Western strikes have already destroyed several arms depots.

The US conducted its latest strikes against Houthi positions on Friday, targeting the Harf Sufyan district in northern Amran bordering Saada.

The sources told Asharq Al-Awsat that Houthi “weapons engineers and military maintenance” personnel moved sophisticated rockets and drones and other types of weapons to fortified caches throughout Saada.

The process was carried out in utmost secrecy and in stages to avoid detection, they added.

In Amran, the Houthis carried out a series of kidnappings against the local population, even its own supporters, on suspicion the people were collaborating with the US and Israel.

The US has carried out dozens of attacks on military positions in Harf Sufyan, destroying facilities that have been used to launch attacks against ships in the Red Sea and Gulf of Aden.

Harf Sufyan is considered the Houthis’ second major stronghold after Saada given its large area that spans around 2,700 square kms. It also borders four other provinces: Hajjah, al-Jawf, Saada and Sanaa.

Moreover, sources in Amran told Asharq Al-Awsat that Harf Sufyan is a major recruitment center for the Houthis, including the forced recruitment of Yemenis.

They revealed that the US strikes in the area dealt the Houthis heavy blows because they directly targeted their military positions, including a drone factory.

The sources suspected that the Americans intensified their strikes on Harf Sufyan after receiving intelligence information that the Houthis had dug tunnels and underground facilities there to hold meetings and recruit new members.