Crowd Control at Japan's Mount Fuji as Hiking Season Begins

Climbers gather on the first day of the climbing season at Fuji Yoshidaguchi Trail (Yoshida Route) at the fifth station on the slopes of Mount Fuji, in Fujiyoshida, Yamanashi Prefecture, Japan July 1, 2024. REUTERS/Issei Kato
Climbers gather on the first day of the climbing season at Fuji Yoshidaguchi Trail (Yoshida Route) at the fifth station on the slopes of Mount Fuji, in Fujiyoshida, Yamanashi Prefecture, Japan July 1, 2024. REUTERS/Issei Kato
TT

Crowd Control at Japan's Mount Fuji as Hiking Season Begins

Climbers gather on the first day of the climbing season at Fuji Yoshidaguchi Trail (Yoshida Route) at the fifth station on the slopes of Mount Fuji, in Fujiyoshida, Yamanashi Prefecture, Japan July 1, 2024. REUTERS/Issei Kato
Climbers gather on the first day of the climbing season at Fuji Yoshidaguchi Trail (Yoshida Route) at the fifth station on the slopes of Mount Fuji, in Fujiyoshida, Yamanashi Prefecture, Japan July 1, 2024. REUTERS/Issei Kato

Mount Fuji's summer climbing season began on Monday with new crowd control measures to combat overtourism on the Japanese volcano's most popular trail.

An entry fee of 2,000 yen ($13) plus an optional donation is being charged for those taking on the Yoshida Trail, and numbers are capped at 4,000 per day, Agence France Presse reported.

Online reservations have also been introduced this year by authorities concerned about safety and environmental damage on Japan's highest mountain, AFP said.

Record tourist crowds are flocking to Japan post-pandemic, with many wanting to see or scale Mount Fuji.

The mountain is covered in snow most of the year but draws more than 220,000 visitors each July-September climbing period.

Many trudge through the night to see the sunrise from the 3,776-meter summit.

Some sleep on the trail or start fires for heat, while others attempt to complete the hike without breaks, becoming sick or injured as a result.

The once-peaceful pilgrimage site has three other main routes that will remain free to climb.

But the Yoshida Trail -- accessed from Tokyo relatively easily -- is the preferred option for most holidaymakers, with around 60 percent of climbers choosing that route.



Holy Kaaba ‘Kiswa’ Cover Is Replaced in Annual Tradition

The installed Kiswa weighs around 1,350 kilograms and is 14 meters high, (SPA)
The installed Kiswa weighs around 1,350 kilograms and is 14 meters high, (SPA)
TT

Holy Kaaba ‘Kiswa’ Cover Is Replaced in Annual Tradition

The installed Kiswa weighs around 1,350 kilograms and is 14 meters high, (SPA)
The installed Kiswa weighs around 1,350 kilograms and is 14 meters high, (SPA)

Saudi Arabia’s General Authority for the Care of the Affairs of the Grand Mosque and the Prophet's Mosque adorned on Sunday the holy Kaaba in Makkah with a new cover, or Kiswa.

Replacing the Kiswa is an annual tradition. A team from the King Abdulaziz Complex for Holy Kaaba Kiswa, consisting of 159 craftsmen, carried out the operation.

A team from the King Abdulaziz Complex for Holy Kaaba Kiswa, consisting of 159 craftsmen, carried out the operation. (SPA)

The installed Kiswa, weighing around 1,350 kilograms and standing 14 meters high, consists of four separate sides and a door curtain. The belt was aligned in a straight line along the four sides and sewn into place.

The Kiswa is made of around 1,000 kilograms of raw silk, dyed black within the complex, 120 kilograms of gold threads, and 100 kilograms of silver threads. The Kiswa belt consists of 16 pieces, along with seven pieces below the belt.

Replacing the Kiswa is an annual tradition. (SPA)

The King Abdulaziz Complex for Holy Kaaba Kiswa employs around 200 craftsmen and administrators.

The complex includes several departments: dyeing and automated weaving, hand weaving, printing, belt-making, gilding, sewing, and assembly of the Kiswa.

The General Authority for the Care of the Affairs of the Grand Mosque and the Prophet's Mosque adorned on Sunday the holy Kaaba in Makkah with a new cover. (SPA)

It houses the world's largest sewing machine, measuring 16 meters, and operating with computerized systems. Additionally, there are supporting departments such as the laboratory, administrative services, quality control, public relations, health services for workers, and occupational safety.