China Energy Engineering Signs Solar Deal with Saudi Partners

 The Sudair solar power project. Photo: PIF
The Sudair solar power project. Photo: PIF
TT

China Energy Engineering Signs Solar Deal with Saudi Partners

 The Sudair solar power project. Photo: PIF
The Sudair solar power project. Photo: PIF

China Energy Engineering signed a 6.98 billion yuan ($972 million) contract to build a solar power plant in Saudi Arabia, a filing with the Shanghai Stock Exchange showed.

The 2 gigawatt (GW) photovoltaic plant will be built by a joint venture between a China Energy Engineering consortium and Saudi partners sovereign fund PIF, ACWA Power and Saudi Aramco Power Company, Reuters reported.

Construction is expected to take 31 months, according to Monday's filing.

Last month, China's TCL Zhonghuan Renewable Energy Technology tied up with Saudi partners including PIF in a $2.08 billion silicon crystal and wafer manufacturing project.



AMAK Obtains Quartz Exploration License in Saudi Arabia

One of AMAC’s mining projects (The company’s website)
One of AMAC’s mining projects (The company’s website)
TT

AMAK Obtains Quartz Exploration License in Saudi Arabia

One of AMAC’s mining projects (The company’s website)
One of AMAC’s mining projects (The company’s website)

Almasane Alkobra Mining Co. (AMAK) has won a quartz exploration license from the Ministry of Industry and Mineral Resources, covering 90.15 square kilometers in the Najran-Aseer province.

In a statement to the Saudi Stock Exchange (Tadawul) on Monday, the company said the license was issued on Aug. 11, 2024 and is valid until Aug. 10, 2029.

It added that the license, which covers a total area of ​​90.15 square kilometers, was issued in accordance with the Mining Investment Law and its executive regulations, indicating that it will conduct the necessary studies and exploratory work on the sites during the regulatory period to ensure the availability of the required raw materials.

The financial impact value and timing of this license will become clear after the completion of exploration work and studies. Any major development regarding this license will be disclosed in a timely manner, AMAK noted.