Egypt to Carry Out Comprehensive Railway Network Development

Egypt’s Transport Minister Kamel al-Wazir in Cairo. (Ministry of Transport)
Egypt’s Transport Minister Kamel al-Wazir in Cairo. (Ministry of Transport)
TT

Egypt to Carry Out Comprehensive Railway Network Development

Egypt’s Transport Minister Kamel al-Wazir in Cairo. (Ministry of Transport)
Egypt’s Transport Minister Kamel al-Wazir in Cairo. (Ministry of Transport)

The Egyptian government is developing its railway network to provide distinguished services to passengers of trains and Cairo metro, Minister of Transport Kamel al-Wazir said.

Wazir said President Abdel Fattah al-Sisi had directed to expand and complete the railway network and develop and rehabilitate Helwan and Shubra el-Kheima train stations.

Wazir added that the political leadership also ordered establishing a giant transportation network of environmentally-friendly electric traction means, such as the three-line monorail network and the monorail and light rail projects, which constitute a major qualitative leap in the country’s means of transportation.

According to the government, the railway development project is based on several elements, including the mobile units (cars and tractors) and the rails (rails, stations and level crossings).

In addition to that, it targets developing the traffic light system to increase safety and security factors and supplying the project sites with all modern equipment, as well as training and educating workers.

Last year, Egypt witnessed several train accidents that left dozens of people dead and injured.

Wazir inspected on Saturday Cairo's main Ramses railway station and was briefed on the trial operation of its electronic gates.

He was also briefed on the new reservation system and its integration with the old reservation system and electronic portals.
According to the Ministry statement, e-gates have been installed at Ramses, Giza, Sidi Gaber, Misr in Alexandria, and Damanhour stations to regulate the entry and exit of passengers.

Wazir said the first metro line will be developed to improve the trains’ arrival times and the service provided to passengers, develop traffic, communication and central control systems, as well as the mobile units by purchasing 55 new air-conditioned trains.



UNRWA: Israel is Using Advanced Weaponry in Jenin Operation

A group of Palestinians (rear) waits to leave from a hospital on the second day of an Israeli military operation in the West Bank city of Jenin, 22 January 2025. EPA/ALAA BADARNEH
A group of Palestinians (rear) waits to leave from a hospital on the second day of an Israeli military operation in the West Bank city of Jenin, 22 January 2025. EPA/ALAA BADARNEH
TT

UNRWA: Israel is Using Advanced Weaponry in Jenin Operation

A group of Palestinians (rear) waits to leave from a hospital on the second day of an Israeli military operation in the West Bank city of Jenin, 22 January 2025. EPA/ALAA BADARNEH
A group of Palestinians (rear) waits to leave from a hospital on the second day of an Israeli military operation in the West Bank city of Jenin, 22 January 2025. EPA/ALAA BADARNEH

Director of UNRWA Affairs in the West Bank Roland Friedrich said Wednesday that Israel is “using advanced weaponry and warfare methods including airstrikes” in its “massive operation” in the flashpoint West Bank town of Jenin.

On Tuesday, Israeli forces launched an operation in Jenin which Palestinian officials said killed 10 people, just days after a ceasefire between Israel and Hamas took effect in the Gaza Strip.

Friedrich said Jenin Camp is “nearly uninhabitable, with some 2,000 families displaced since mid-December.”

“UNRWA has been unable to provide full services to the camp in this time,” he said on X.

“The operation comes merely a week before implementation of Israeli legislation that severely undermines UNRWA’s operations in the West Bank, including coordination of humanitarian access,” he said.

“It also threatens to undermine the fragile ceasefire reached just days ago in Gaza,” Friedrich added.