Agreement Signed to Establish Saudi Arabia’s 1st Integrated Steel Plate Manufacturing Complex

Officials sign the agreement on Monday, (Aramco)
Officials sign the agreement on Monday, (Aramco)
TT

Agreement Signed to Establish Saudi Arabia’s 1st Integrated Steel Plate Manufacturing Complex

Officials sign the agreement on Monday, (Aramco)
Officials sign the agreement on Monday, (Aramco)

Saudi Aramco, one of the world’s leading integrated energy and chemicals companies, Baoshan Iron & Steel Co., Ltd. (Baosteel), the world’s leading steel conglomerate, and the Public Investment Fund (PIF) signed on Monday a shareholders’ agreement to establish an integrated steel plate manufacturing complex in the Kingdom of Saudi Arabia.

Subject to customary regulatory approvals and closing conditions, the joint venture complex is expected to be located in Ras al-Khair Industrial City, one of the four new Special Economic Zones recently announced by Prince Mohammed bin Salman bin Abdulaziz, Crown Prince, Prime Minister and Chairman of the Council of Economic and Development Affairs.

The complex would bring together Aramco’s unrivaled energy and industrial services ecosystem, Baosteel’s advanced steel plate industry capability and PIF’s strong financial capabilities and investment expertise, said a press statement.

It would be the first facility of its kind in the Kingdom and the Gulf Cooperation Council (GCC) region, advancing the regional steel industry ecosystem. The project aims to enhance the domestic manufacturing sector through localizing the production of heavy steel plates, transferring knowledge and creating export opportunities.

The facility is expected to have a steel plate production capacity of up to 1.5 million tons per year. It would also be equipped with a natural gas-based direct reduced iron (DRI) furnace and an electric arc furnace, which aims to reduce CO2 emissions from the steel-making process by up to 60% compared to a traditional blast furnace. The DRI plant would be compatible with hydrogen without the need for major equipment modifications, potentially reducing CO2 emissions by up to 90% in the future.

Amin Nasser, Aramco President & CEO, said: “The Kingdom’s first steel plate production facility is expected to enhance Saudi Arabia’s steel industry ecosystem and improve supply chain localization.”

“Under Aramco’s flagship industrial investment program, Namaat, and supported by the government’s Shareek program, this joint venture is expected to create jobs and contribute to economic growth and diversification. This joint venture is also an example of bringing together expertise from other sectors. With Baosteel and PIF supporting in capacity building in the Kingdom’s industrial sector, Aramco aims to create additional value for our company and our partners,” he added.

Yazeed A. Al-Humied, Deputy Governor and Head of MENA Investments at PIF, said: “PIF is diversifying the Saudi economy by unlocking opportunities and enabling key strategic sectors in the local market. This partnership aims at establishing an integrated steel plate manufacturing facility that will strengthen Saudi Arabia’s industrial development and enable its role as a supplier within the metal industry.”

“It will also build on PIF’s mandate to establish new strategic partnerships locally and globally; localize technologies and knowledge; enable the private sector; and create more direct and indirect job opportunities in the local market. Since 2017, PIF has invested in 13 strategic sectors and established 77 new companies domestically,” he stressed.

Zou Jixin, Chairman of Baosteel, said: “This project is an active practice by Baosteel to explore lower-carbon paths for the steel industry, a major achievement in promoting the international development strategy of Baosteel. The project aims to contribute positively to the localization of the steel industry chain, job creation and local economic prosperity in Saudi Arabia.”

Chen Derong, Chairman of Baowu Group (the parent company of Baosteel), and Hu Wangming, President of Baowu Group, have further endorsed the project with full confidence.

Saudi Arabia would be the project’s primary target market, with plans to export to the GCC and broader MENA region. It is expected to create new jobs and significantly reduce reliance on imported steel, serving customers in several strategic industrial sectors including pipelines, shipbuilding, rig manufacturing, offshore platform fabrication and tank and pressure vessel manufacturing. It also would aim to serve the construction, renewables and marine sectors.

The investment aligns with PIF’s strategy to unlock the capabilities of promising sectors and strategically important industries that can drive the diversification of the local economy. It will support a number of PIF’s priority sectors that require steel plate and create a more resilient steel industry in the region.

The steel plate complex is supported by the Kingdom’s Shareek program for large companies, which aims to foster greater private-public cooperation, create jobs and enhance the development of the Saudi economy by providing incentives for domestic investment. It also falls under Aramco’s Namaat program, which aims to establish strategic partnerships that drive Saudi Arabia’s economic, supply chain and industrial investment diversification and expansion.



Saudi Arabia Allows Contracting Exceptions for Firms without Regional HQ

The King Abdullah Financial District in Riyadh (Asharq Al-Awsat)
The King Abdullah Financial District in Riyadh (Asharq Al-Awsat)
TT

Saudi Arabia Allows Contracting Exceptions for Firms without Regional HQ

The King Abdullah Financial District in Riyadh (Asharq Al-Awsat)
The King Abdullah Financial District in Riyadh (Asharq Al-Awsat)

Saudi Arabia has introduced greater flexibility into its investment environment, allowing government entities, under strict controls to safeguard spending efficiency and ensure the delivery of critical projects, to seek exceptions to contract with international companies that do not have regional headquarters in the kingdom.

The Local Content and Government Procurement Authority notified all government bodies of the mechanism to apply for exemptions through the Etimad digital platform.

The step is designed to balance enforcement of the “regional headquarters relocation” decision, in force since early 2024, with the needs of technically specialized projects or those driven by intense price competition.

Under a government decision that took effect at the start of 2024, state entities, including authorities, institutions and government-affiliated funds, are barred from contracting with any foreign commercial company whose regional headquarters in the region is located outside Saudi Arabia.

According to the information, the Local Content and Government Procurement Authority informed all entities of the rules governing contracts with companies that lack a regional headquarters in the kingdom and related parties.

Government entities may request an exemption from the committee for specific projects, multiple projects or a defined time period, provided the application is submitted before launching a tender or initiating direct contracting procedures.

Submission mechanism

In two circulars, the authority detailed how to submit exemption requests and clarified the cases in which contracting is permitted under the controls. It said the exemption service was launched on the Etimad platform in November 2025.

The service is available to entities that float tenders through Etimad. Requests for tenders launched before the service went live, as well as those issued outside the platform, will continue to follow the previously adopted process.

Etimad is the kingdom’s official financial services portal run by the Ministry of Finance, aimed at driving digital transformation of government procedures and boosting transparency and efficiency in managing budgets, contracts, payments, tenders and procurement. The platform streamlines transactions between state entities and the private sector.

Technical criteria

When issuing the contracting controls, the government made clear that companies without a regional headquarters in Saudi Arabia, or related parties, are not barred from bidding for public tenders.

However, their offers can only be accepted in two cases: if there is no more than one technically compliant bid, or if the offer ranks among the best technically and is at least 25% lower in price than the second-best bid after overall evaluation.

Contracts with an estimated value of no more than 1 million riyals ($266,000) are also exempt. The minister may, in the public interest, amend the threshold, cancel the exemption or suspend it temporarily.

More than 700 headquarters

More than 700 multinational companies had relocated their regional headquarters to Riyadh by early 2026, exceeding the initial target of attracting 500 companies by 2030. The program seeks to cement the kingdom’s position as a regional business hub and to localize global expertise.

When announcing the contracting ban, Saudi Arabia said the move was intended to incentivize foreign firms dealing with the government and its affiliated entities to adjust their operations.

It aims to create jobs, curb economic leakage, raise spending efficiency and ensure that key goods and services procured by government entities are delivered inside the kingdom with appropriate local content.

The government said the policy aligns with the objectives of the Riyadh 2030 strategy unveiled during the recent Future Investment Initiative forum, where 24 multinational companies announced plans to move their regional headquarters to the Saudi capital.

It stressed that the decision does not affect any investor’s ability to enter the Saudi economy or continue working with the private sector.

 


IMF Board to Review Staff-level $8.1 Bln Agreement for Ukraine

The city's downtown on a frosty winter day, amid Russia's attack on Ukraine, in Kyiv, Ukraine February 19, 2026. REUTERS/Alina Smutko
The city's downtown on a frosty winter day, amid Russia's attack on Ukraine, in Kyiv, Ukraine February 19, 2026. REUTERS/Alina Smutko
TT

IMF Board to Review Staff-level $8.1 Bln Agreement for Ukraine

The city's downtown on a frosty winter day, amid Russia's attack on Ukraine, in Kyiv, Ukraine February 19, 2026. REUTERS/Alina Smutko
The city's downtown on a frosty winter day, amid Russia's attack on Ukraine, in Kyiv, Ukraine February 19, 2026. REUTERS/Alina Smutko

The International Monetary Fund on Thursday said its board ​would review a staff-level agreement for a new $8.1 billion lending program for Ukraine in coming days.

IMF spokeswoman Jule Kozack told reporters that Ukrainian authorities had completed the prior actions needed to move forward with the request ⁠of a new ⁠IMF program, including submission of a draft law on the labor code and adoption of a budget.

She said Ukraine's economic growth in 2025 ⁠was likely under 2%. After four years of war, the country's economy had settled into a slower growth path with larger fiscal and current account balances, she said, noting that the IMF continues to monitor the situation closely.

"Russia's invasion continues to take a ⁠heavy ⁠toll on Ukraine's people and its economy," Kozack said. Intensified aerial attacks by Russia had damaged critical energy and logistics infrastructure, causing disruptions to economic activity, Reuters quoted her as saying.

As of January, she said, 5 million Ukrainian refugees remained in Europe and 3.7 million Ukrainians were displaced inside the country.


US Stocks Fall as Iran Angst Lifts Oil Prices

A screen displays a stock chart at a work station on the floor of the New York Stock Exchange (NYSE) in New York City, US, April 6, 2022. REUTERS/Brendan McDermid
A screen displays a stock chart at a work station on the floor of the New York Stock Exchange (NYSE) in New York City, US, April 6, 2022. REUTERS/Brendan McDermid
TT

US Stocks Fall as Iran Angst Lifts Oil Prices

A screen displays a stock chart at a work station on the floor of the New York Stock Exchange (NYSE) in New York City, US, April 6, 2022. REUTERS/Brendan McDermid
A screen displays a stock chart at a work station on the floor of the New York Stock Exchange (NYSE) in New York City, US, April 6, 2022. REUTERS/Brendan McDermid

Wall Street stocks retreated early Thursday as worries over US-Iran tensions lifted oil prices while markets digested mixed results from Walmart.

US oil futures rose to a six-month high as Iran's atomic energy chief Mohammad Eslami said no country can deprive the Islamic republic of its right to nuclear enrichment, after US President Donald Trump again hinted at military action following talks in Geneva.

"We'd call this an undercurrent of concern that is bubbling up in oil prices," Briefing.com analyst Patrick O'Hare said of the "geopolitical angst."

About 10 minutes into trading, the Dow Jones Industrial Average was down 0.6 percent at 49,379.46, AFP reported.

The broad-based S&P 500 fell 0.5 percent to 6,849.35, while the tech-rich Nasdaq Composite Index declined 0.6 percent to 22,621.38.

Among individual companies, Walmart rose 1.7 percent after reporting solid results but offering forecasts that missed analyst expectations.

Shares of the retail giant initially fell, but pushed higher after Walmart executives talked up artificial intelligence investments on a conference call with analysts.

The US trade deficit in goods expanded to a new record in 2025, government data showed, despite sweeping tariffs that Trump imposed during his first year back in the White House.